Sewer

The following data is for the month of March 2019:

 

 

 

 

  • Wastewater treated during the month of March 2019 for the Strodes Creek WWTP was 105,030,000 gallons.  Average wastewater treated was 3.39 MGD; peak day was 6.22 MGD.  Year-to-date wastewater treated is 1,276,120,000 gallons.  Year-to-date average day is 4.67 MGD.  Influent BOD averaged 12,093 lbs./day.  Maximum day influent BOD loading was 13,553 lbs.  The plant is designed to treat 39,000 lbs. /day of BOD.  Influent TSS average 4,406 lbs. /day.  Maximum day influent TSS loading was 4,945 lbs.  The plant is designed to treat 21,000 lbs. /day of TSS.  Average day BOD loading was 31% of capacity.   Average day TSS loading was 21% of capacity.  Removal efficiency for BOD was 99% and for TSS was 97%. Average day hydraulic loading was 47% of capacity.  Estimated bypass from the wastewater treatment plant was 0 gallons.  Estimated overflow from the collection system was 599,865 gallons.
    • Wastewater treated during the month of March 2019 for the LHC WWTP was 33,170,000.  Average wastewater treated was 1.07 MGD; peak day was 2.78 MGD.  Year-to-date wastewater treated is 350,060,000.  Year-to-date average day is 1.29 MGD.  Influent BOD averaged 593 lbs./day.  Maximum day influent BOD loading was 751 lbs.  The plant is designed to treat 1,670 lbs./day of BOD.  Influent TSS average was 781 lbs./day.  Maximum day influent TSS loading was 1,114 lbs.  The plant is designed to treat 3,000 lbs./day of TSS.  Average day BOD loading was 36% of capacity.  Average day TSS loading was 26% of capacity.  Removal efficiency for BOD was 98% and for TSS was 97%.  Estimated bypass from the wastewater treatment plant was 0 gallons.  Average day hydraulic loading was 54% of capacity.
    • Total sludge to the belt filter presses at Strodes Creek for March 2019 was 177 dry tons; average day was 5.7 dry tons.  YTD sludge to the belt filter presses is 1,439 dry tons.  Total Landfill Quality Biosolids produced for March 2019 was 177 dry tons.  YTD Landfill Quality Biosolids produced is 1,447 dry tons.
    • Total lagoon sludge to belt filter presses at Strodes Creek for March 2019 was 0 dry tons; average day was 0 dry tons. YTD lagoon sludge to the belt filter presses is 8.2 dry tons.
    • Total sludge to the belt filter presses at Lower Howards Creek for March 2019 was 7.3 dry tons; average day was 0.2 dry tons.  Maximum day 3.9 dry tons.  YTD sludge to the belt filter presses is 58.3 tons.